Back to D-512 Agreement between Owner and Design-Builder for Progressive Design-Build (Download)
D-512 Agreement between Owner and Design-Builder for Progressive Design-Build (Download)

D-512 Agreement between Owner and Design-Builder for Progressive Design-Build (Download)

  • Downloading: Allowed Max downloads:5 Access allowed for: 30 day

Prepared by the Engineers Joint Contract Documents Committee (EJCDC).
2026
D-512 is a flexible two-phase agreement for progressive design-build projects in which the Design-Builder is selected early and final construction pricing is established later as the design advances.

  • List Price: $176.00
  • Member Price: $114.40
Item Details:

Prepared by the Engineers Joint Contract Documents Committee (EJCDC).

D-512, Agreement Between Owner and Design-Builder for Progressive Design-Build, is a core agreement for implementing the progressive design-build delivery method. It is structured to support early engagement of the Design-Builder...

Back to D-512 Agreement between Owner and Design-Builder for Progressive Design-Build (Download)
View More View Less

0