Back to CMA-942 Field Order (Download)
CMA-942 Field Order (Download)

CMA-942 Field Order (Download)

  • Downloading: Allowed Max downloads: 5 Access allowed for: 30 day

Prepared by the Engineers Joint Contract Documents Committee (EJCDC).
2021
CMA-942 is used by the construction manager to order minor changes to the work that do not change the contract price or contract times.

  • List Price: $54.00
  • Member Price: $27.00
 
Want to save more?
Log into see if you qualify for a lower rate.
Members save $27.00 or more Join
Item Details:

Prepared by the Engineers Joint Contract Documents Committee (EJCDC).

CMA-942, Field Order, is used by the construction manager to order minor changes to the work that do not change the contract price or contract times. See Paragraph 11.04 of CMA-700, Standard General Conditions of the Construction...

Back to CMA-942 Field Order (Download)
View More View Less

0